block-pathIt requires a lot of skill and expertise to lay tarmac and concrete correctly, the best option is to allow professional do that for you. But on the contrary, laying gravels and paving slabs are fairly easier if compared to laying tarmac and concrete. You can lay it yourself and save some money. It doesn’t take too much time and energy to do but you have to be patient and follow the guide as contained in this article. However, the importance of laying a path cannot be overstated, the beauty of having a path is much appreciated when the rains start dropping. When you want to choose a path it’s better to make use of a path that is an apparent path through the garden. The route must be such that it leads to those key areas of the garden so that it would make it easy to move around. Where there is no clear path, fashion out one by making use of hurdles or barricades.

Let the paved part be in a location where the full sun is positioned, as much as possible. The part will be used of frequently, meaning that the paved part must be located in a private area. Else, there will always be a feeling of discomfort.

The three methods to laying paving are on a sand bed, dry sand bed, or sand and cement mortar. The easiest one is laying paving on sand and it’s the most frequently used pattern. If you intend to lay a gravel paving, the first step is to remove about ten to fifteen centimetres of the top soil, or more if the ground is moist. Also, put into consideration the construction of a drainage as it might be necessary if the ground is not soft and it’s prone to flooding when it starts raining.

garden-pathGather the remaining soil you removed properly as they would still be useful. Lay about five centimetres of hardcore for gravel paving and five centimetres of sand on ten centimetres of hardcore for paving slabs. If you lay gravel on hardcore it would last longer. But if the gravel is laid on the soil directly, it most often sinks into the soil. The foundation ought to be firm.

It is necessary to get an exact level for paving slabs, specifically for paths that are wider than a couple of meters. To realise this, a screed ought to be set up. Firstly, drive in short pegs so that you can get the level of the foundation.

If you want the thickness of the slab to be on the top, then you need to make use of a long, straight cut wood, so as to get the top of the pegs to the accurate height. A minor slope, to remove water, ought to be built in at this initial stage – one centimetre in one meter is sufficient.

Get two pieces of 5 x 5 cm wood and place them along with the pegs. Make sure that you fill in the sand properly and secure it accurately, then level it with a third straight edge which should be laid across the two pieces of wood.

When the sand is equal and evenly steady, then you lay the slabs in the various positions, and leave a minor gap that can be used to manoeuvre. Use degrees in levelling and laying the slabs. The appropriate measurement is one part dry cement to eight parts of sand – because when it is used it gives a stronger base. The cement sets in time.

If you intend to make use of a kerb, ensure that it is used to hold the flanks of the paved or gravel areas, particularly the paths, it ought to be put in place beforehand, and then you lay the foundations. Place the kerbing on the bed of sand and cement with a ratio of three to one and let it set. It should be laid to be level, and slope evenly. You can fix rough kerbing without putting it in concrete.

A suitable type of informal kerb is a mowing strip of blocks arranged to be level with the soil of the lawn. It decreases the quantity of lawn edge cutting and it can continue around the lawn edge – and should not just be at the pathways. There is no need setting the mowing strip in concrete.

You can also lay the slabs on a bed of wet sand and the cement mortar ratio should be 5:1 to be laid beneath each slab. The quantity made use of should be sufficient to let the slabs to be casually tapped to their right level. The foundation level ought to be perfectly laid out with pegs in advance and these pegs have to be regularly checked as the slabs are laid. This is truly the best technique to lay natural stone paving, which most times has a thickness that varies and very tough to lay on a level sand bed.

patioTake the measurement of the path to be paved and estimate the amount of slabs that would be needed. A slab of about 40cm x 40cm would occupy one square meter, 4.2 slabs or 2.8 slabs. If you make use of one tonne of sand it would cover approximately ten square meters with a depth of about five centimetres. Measuring the layout of slabs cautiously is very important so as to decrease the quantity of slabs that ought to be cut.

So many people always want to try their hands on concrete and cement, but most often find it difficult to know the right pattern or ratio to use. This easy step by step guide would give you the desired path if you follow it carefully. Laying a path can be done with the assistance of some friends so that it wouldn’t look so difficult because it’s not for a professional. Ensure that you use the appropriate ratio as stated so that the path would be solid and not collapse after a while. knowing the accurate proportion of sand and cement to form a mortar is very important. If the volume of sand used is much more than the cement, you wouldn’t get a solid job. The path may start pulling off after some time. So proper mixing of sand and cement to get your mortar is paramount.